Work Programme

The EMF Work Programme was adopted by the third Congress on 6-7 June 2007 in Lisbon.

The Work Programme contains the following headlines:

  • Introduction
  • Collective Bargaining
  • Industrial Policy
  • Automobile
  • Aerospace
  • Steel
  • Information and Communication Technologies
  • Shipbuilding
  • Defence
  • Lifts
  • Training and Education
  • Equal Opportunities
  • Company Policy
  • Social Dialogue
  • Enlargement
  • Infrastructure Needs
  • Training Needs

Flash news

 

eZ debug

Timing: Jul 24 2008 19:46:44
Module start 'content'
Timing: Jul 24 2008 19:46:44
Module end 'content'
Timing: Jul 24 2008 19:46:44
End

Timing points:

CheckpointElapsedRel. ElapsedMemoryRel. Memory
Module start 'content'0.0000 sec0.1054 sec1,560.4688KB3,984.4766KB
Module end 'content'0.1054 sec0.1069 sec5,544.9453KB1,554.2500KB
End0.2123 sec 7,099.1953KB0.0010KB
Total runtime:0.2257 sec

Time accumulators:

 Accumulator Elapsed Percent Count Average
ini_load
Load cache0.0518 sec14.5765%80.0065 sec
Mysql Total
Mysql_queries0.0678 sec19.0722%80.0085 sec
Looping result0.0003 sec0.0786%50.0001 sec
Template Total0.0986 sec 27.7% 1 0.0986 sec
Template load0.0248 sec6.9656%10.0248 sec
Template processing0.0735 sec20.6667%10.0735 sec
override
Cache load0.0209 sec5.8698%10.0209 sec
Total script time:0.3556 sec

Templates used to render the page:

 Template Requested template Template loaded Edit Override
pagelayout.tplpagelayout.tpl design/emf2/templates/pagelayout.tpl
page_head.tplpage_head.tpl design/sydesy/templates/page_head.tpl
link.tpllink.tpl design/emf2/templates/link.tpl
page_mainarea.tplpage_mainarea.tpl design/standard/templates/page_mainarea.tpl
page_warning.tplpage_warning.tpl design/standard/templates/page_warning.tpl
page_toppath.tplpage_toppath.tpl design/sydesy/templates/page_toppath.tpl
     
 Total templates count: 6
home page/About the EMF/