Joint EMF and DGB Bildungswerk project

„Strengthening of the Social Dialogue in South-Eastern Europe through CSR instruments“

The EMF and DGB Bildungswerk with the financial support of the European Commission launched recently a joint project for the EMF affiliates in the South-Eastern Europe.

The project initiative is primarily aimed at trade unions and workers’ representatives from the Acceding and Candidate Countries: Bulgaria, Romania, Turkey, Croatia and Macedonia.

The project aims are:
• Stocktaking and analysis of the actual situation and recent developments in the metal industry both in the region as a whole and in the respective countries, as well as forecasts for the future
• Broadening of worker representatives’ and trade unionists’ knowledge and improvement of their skills in relation to various CSR instruments and their use in the Social Dialogue process
• Establishing networks, improving communication and information as well as strengthening cross-border co-operation

Five workshops will be organized in the respective countries. The project will be accompanied by a survey, which will provide better knowledge of metal industry in the region. A closing conference should be held in spring 2007 to evaluate project results and settle future work objectives.

For further information please contact:
Peter Scherrer, General Secretary
Alicja Masievic, Policy Adviser

Flash news

 

eZ debug

Timing: Jul 24 2008 19:42:43
Module start 'content'
Timing: Jul 24 2008 19:42:43
Module end 'content'
Timing: Jul 24 2008 19:42:43
End

Timing points:

CheckpointElapsedRel. ElapsedMemoryRel. Memory
Module start 'content'0.0000 sec0.2202 sec1,560.7422KB3,984.9688KB
Module end 'content'0.2202 sec0.2710 sec5,545.7109KB1,551.5156KB
End0.4913 sec 7,097.2266KB0.0010KB
Total runtime:0.4925 sec

Time accumulators:

 Accumulator Elapsed Percent Count Average
ini_load
Load cache0.0800 sec4.2486%80.0100 sec
Mysql Total
Mysql_queries1.3040 sec69.2616%80.1630 sec
Looping result0.0003 sec0.0147%50.0001 sec
Template Total0.2563 sec 13.6% 1 0.2563 sec
Template load0.0694 sec3.6855%10.0694 sec
Template processing0.1865 sec9.9080%10.1865 sec
override
Cache load0.0661 sec3.5113%10.0661 sec
Total script time:1.8827 sec

Templates used to render the page:

 Template Requested template Template loaded Edit Override
pagelayout.tplpagelayout.tpl design/emf2/templates/pagelayout.tpl
page_head.tplpage_head.tpl design/sydesy/templates/page_head.tpl
link.tpllink.tpl design/emf2/templates/link.tpl
page_mainarea.tplpage_mainarea.tpl design/standard/templates/page_mainarea.tpl
page_warning.tplpage_warning.tpl design/standard/templates/page_warning.tpl
     
 Total templates count: 5
home page/Projects/